Discover What We Offer

Renewable Energy Projects.

PROJECT 1

PROJECT: 133.5 MW PV, 66 MW BESS, 10 Wind Turbines x 2 MW

Location:
West Pomeranian Voivodeship (Poland)
Total land area: 179 ha (combined plots)

Planned Grid Connection Capacity:

  • 133.5 MW photovoltaic (PV) installation with energy storage

  • 66 MW battery energy storage system (BESS)

  • 7 wind turbines (2 MW each) – permitting in progress

Distance to Nearest Grid Infrastructure:

  • 16 km from the high-voltage substation

  • 12 km from another high-voltage substation

Permits & Approvals:

  • Environmental decision: Final and legally binding for 133.5 MW PV + energy storage

  • Zoning decision: Final and legally binding for 133.5 MW PV + energy storage

  • Additional 13.5 MW currently under environmental review

Key Advantages and Development Perspectives:

 

  • The land complex is located a short distance from the city of Szczecin

  • Possibility to integrate a hydrogen production concept within the project

  • Strategically positioned near key energy and industrial stakeholders:

    • Seaport

    • Power plant

    • German border (e.g. nearby refinery)

  • Cross-border transmission potential – German border just 35 km in a straight line

  • Excellent conditions for efficient energy production management and optimization

PROJECT 2

Wind Turbine PROJECT – 7 x 2 MW

  • Location:
    West Pomeranian Voivodeship (Poland)
    Total land area: approx. 60 ha (multiple plots)

    Grid Infrastructure Proximity:

    • Medium-voltage network (MV) – directly adjacent to the site

    • 6.18 km (as the crow flies) from the high-voltage substation in Widuchowa

    • 14 km from the Dolna Odra power station

    Planned Capacity:

    • 7 wind turbines, each with a capacity of 2 MW

    • Project includes the option to integrate energy storage systems

Key Advantages and Development Perspectives:

 

Potential to connect with Project 1 using cable pooling, enabling shared grid infrastructure and optimized connection capacity

PROJECT 3

PROJECT 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Grid Access:

  • Medium-voltage line (MV) crosses the site

  • High-voltage line (HV) located approx. 1.5 km from the site

  • Distance to substation: approx. 513 m

Land Area:

  • Adjacent plots, excluding class III agricultural land

  • Two designated areas: 5.5 ha and 0.61 ha

Planned Grid Connection Capacity:

  • 100.8 MW battery energy storage system

  • Storage capacity: 420 MWh

Key Advantages and Development Perspectives:

 

  • Wind farm located just 305 meters from the site

  • Photovoltaic farm located 513 meters from the site

  • Opportunity to design the battery storage system to support nearby operational wind and solar farms

  • The owner of the adjacent generation assets holds distribution system operator rights, enabling local grid balancing and optimized energy flow

PROJECT 4

PROJECT 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
15 hectares

Grid Infrastructure Proximity:

  • Medium-voltage line (MV) – 108 meters from the site

  • High-voltage line (HV) – approx. 2 km from the site

  • Nearest high-voltage substation – approx. 10 km away

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

Key Advantages and Development Perspectives:

 

  • A planned biogas plant (up to 3.5 MW) is located on the adjacent plot

  • The proximity of the biogas installation creates additional potential for energy storage integration and optimized local energy management

PROJECT 5

PROJECT – 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
Two adjacent plots (excluding class III agricultural land):

  • 0.74 ha

  • 0.68 ha

Grid Infrastructure Proximity:

  • Medium-voltage line (MV) crosses the property

  • High-voltage line (HV) – approx. 1.5 km away

  • Nearest high-voltage substation – approx. 6.3 km away

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

PROJECT 6

PROJECT – 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
Three adjacent plots (excluding class III agricultural land):

  • 1.6 ha

  • 0.38 ha

  • 0.76 ha 

Grid Infrastructure Proximity:

  • High-voltage line (HV) – approx. 85 m from the site

  • Nearest high-voltage substation – approx. 8.5 km away

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

PROJECT 7

PROJECT – 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
0.76 hectares

Grid Infrastructure Proximity:

  • High-voltage line (HV) – approx. 619 m from the site

  • Medium-voltage line (MV) – approx. 154 m from the site

  • Nearest high-voltage substation – approx. 7.44 km away

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

PROJECT 8

PROJECT – 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
1.3 hectares (excluding class III agricultural land)

Grid Infrastructure Proximity:

  • Medium-voltage line (MV) – approx. 74 m from the site

  • Nearest high-voltage substation – approx. 6.5 km away

Additional Location Advantage:

  • Approx. 3 km from the local economic zone, home to a Zalando logistics center

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

  • Grid connection application submitted

Key Advantages and Development Perspectives:

 

  • Located within a Natura 2000 protected area

  • For energy storage facilities with a development footprint under 1 hectare, no environmental restrictions apply under current legislation

PROJECT 9

PROJECT – 100,8 MW BESS

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
3.46 hectares (excluding class III agricultural land)
Planned land use: up to 1 hectare

Grid Infrastructure Proximity:

  • Medium-voltage line (MV) located on the plot

  • Nearest high-voltage substation – approx. 4 km away

Planned Connection Parameters:

  • 100.8 MW battery energy storage system (BESS)

  • Total storage capacity: 420 MWh

  • Grid connection application submitted

PROJECT 10

PROJEKT – 100,8 MW ME

  • Location:
    Lower Silesian Voivodeship (Poland)

    Land Area:
    Approx. 4 hectares across a complex of plots within a built-up area
    Planned land use: up to 1 hectare

    Grid Infrastructure Proximity:

    • Medium-voltage line (MV) located between the plots

    • Nearest high-voltage substation – approx. 9.44 km (as the crow flies)

    • Alternative substation – approx. 10.5 km away

    Planned Connection Parameters:

    • 100.8 MW battery energy storage system (BESS)

    • Total storage capacity: 420 MWh

PROJECT 11

Wind Turbine PROJECT – 7 x 2 MW

Location:
Lower Silesian Voivodeship (Poland)

Land Area:
3 land complexes totaling approx. 95 hectares

Grid Infrastructure Proximity:

  • Medium-voltage line (MV) – between the plots

  • High-voltage line (HV) – distances depending on area: 2.3 km, 2.6 km, and 3.8 km

  • Nearest high-voltage substations:

    • 9 km (as the crow flies)

    • 12.23 km

    • 24.5 km

Planned Connection Parameters:

  • 7 wind turbines, each with a capacity of 2 MW (total: 14 MW)

Key Advantages and Development Perspectives:

 

  • Limited presence of environmental protection areas – partially unrestricted in terms of nature conservation regulations

  • Selected areas of the site are free from any formal environmental restrictions, allowing for more flexible development

PROJECT 12

PROJECT 125 MW PV + 7 x 2 MW Wind Turbines

Location:
West Pomeranian Voivodeship (Poland)

Land Area:
Multiple land complexes totaling approx. 200 hectares

Grid Infrastructure Proximity:

  • Medium-voltage lines (MV) run through the plots

  • High-voltage lines (HV) – depending on the area, partially cross the plots

  • Nearest high-voltage substation – approx. 10.3 km

Connection Parameters:

  • Decision of development conditions 125 MW

  •  

Securing New Locations

Projects on various stages for choosing by you

PARTNER WITH US AND GAIN MORE

Key Advantages for Investors and Partners

Fast-Track Your Investment

Efficiency Which Delivers Results

Reduced Risk

Legal and environmental risks mitigated through our experience

Flexible Cooperation

Tailored to meet your investment vision